Fiber & Broadband

Fiber & Broadband

Outside plant and FTTx design and construction, aerial and underground placement, fusion splicing, OTDR and OLTS testing, and documented turn-up for broadband operators.

OSP and FTTx scope

Fiber placed, spliced, tested and documented.

Fiber work is judged on documentation as much as on splice loss. A route that tests clean but cannot be traced in two years is a liability.

We build, splice, test and document — and deliver traceable records that stay useful for the life of the asset.

Fiber scope

  • OSP and FTTx route design and engineering
  • Aerial placement and strand work
  • Underground placement, boring and trenching
  • Fusion splicing and enclosure work
  • OTDR bidirectional testing and OLTS loss testing
  • Fiber turn-up and service verification
  • As-built records and route documentation

Placement, splicing and turn-up

From route design to service turn-up.

01  Design

Route engineering, splice plan and material take-off.

02  Construct

Aerial or underground placement to the applicable standard and permit.

03  Splice

Fusion splicing and enclosure work, with splice-loss checks as each splice is made.

04  Test

Bidirectional OTDR and end-to-end loss testing against acceptance thresholds.

05  Document

Traces, loss budgets and as-built route records delivered as a package.

Testing, restoration and closeout

Records that stay useful for the life of the asset.

Test traces, loss budgets and as-built route records delivered as one package.

  • Bidirectional OTDR traces per fiber
  • End-to-end loss test results against budget
  • Splice records and enclosure documentation
  • As-built route and footage records
  • Photographic closeout